Golf Courses

SICILY – RAGUSA (RG)

 

100_5148

 

Description

“Donnafugata Golf Resort S.p.A.” locality Torre di Piombo  (RG).

Realization of a 18 hole golf course18 buche South camp. Attached accomodation facilities such as club houses, appartments on stell structures placed on anchir bolts; included of head points of the property; assistance from the start of the worksite to the end of the works; Ha 59,00

Operation conducted

  • Quoted Plane;
  • Creation of base points;
  • First Establishing (road axises / expropriations);
  • Official drawings;
  • Volume computations;
  • On site assistance and tracings.

 

Photo Gallery


 

^BD5F3EAF55782B3FFE1535D3483633D6303031FF1DD60A9032^pimgpsh_fullsize_distr

 

Description

18 hole golf course north “Donnafugata Golf Resort S.p.A.” locality Torre di Piombo (RG).
Actual works for cubature measurements with amount of material removed with the balance of the grounds; Ha 36,00.

Operation conducted

  • Quoted Plane;
  • Official drawings;
  • Volume computations.

 

Photo Gallery

 



 

 

TAORMINA LOCALITY TRAPPITELLO (ME)

campidagolftaormina

Description

Taormina Golf Course locality Trappitello -  Taormina (ME).
For Variant with global cubature measurement to be undertaken; Ha 50,00

Operation conducted

  • Quoted Plane;
  • Creation of base points;
  • Official drawings;
  • Volume computations.

 



 

 

CAMPANIA – SERRE (SA)

campidagolfserre

Description

“Persano Royal Golf” Course in the municipality of Serre (SA).
Correction of base head points made by other technicians; daily assistance; Ha 64,00 for 18 holes and Ha 30 for the 9 holes.

Operation conducted

  • Quoted Plane;
  • Creation of base points;
  • First Establishing (road axises / expropriations);
  • Official drawings;
  • Volume computations;
  • On site assistance and tracings.

 

Photo Gallery

 



 

ISLAND OF DO SAL -  CAPO VERDE

campoverdedagolf

Description

“COTTON BAY MARINA GOLF RESORT” golf course on the Island of Do Sal Capo Verde, with a global surface of Ha 417,31 collected for Ha 88,00, materializing 12 Km of hole obstruction.

Operation conducted

  • Quoted Plane;
  • Creation of base points;
  • First Establishing (road axises / expropriations);
  • Official drawings;
  • Volume computations;
  • On site assistance and tracings.

 

Photo Gallery